Setup, Compatibility & Care
Installation must be performed by a qualified professional due to the hardwired electrical requirements (220-240V or 380-415V 3-phase). It is highly recommended to install a dedicated water softener and filtration system upstream to protect the copper boiler from scale buildup, which is the leading cause of machine failure in commercial settings.
For daily maintenance, wipe down the steam wands immediately after use and perform a backflush of the group heads using a commercial-grade detergent at the end of each shift. Regularly check the boiler and pump pressure gauges during startup to ensure all systems are within the manufacturer's operational range.