Setup, Compatibility & Care
Installation: Ensure all heating products come complete with fixing screws. It is recommended that pipework is not installed until the radiator or heated towel rail has been received to ensure precise measurements. Extra care must be taken during installation to avoid damaging the fittings. All tappings are 1/2" British Standard Pipe. After installing any new radiators, when refilling the system, it is recommended a suitable inhibitor is used.
Compatibility: This radiator is suitable for all types of interior spaces and heating systems that accommodate 1/2" British Standard Pipe connections.
Care: To maintain the satin white finish, clean with a soft, damp cloth. Avoid abrasive cleaners that could damage the surface.