Setup, Compatibility & Care
Setup: Before installation, ensure the subfloor (or joists) is level and structurally sound. Remove any debris and ensure a clean working surface. Acclimatize the OSB boards to the environment where they will be installed for at least 48 hours to minimize expansion or contraction after installation.
Compatibility: These floorboards are compatible with most standard construction materials. They can be used with a variety of flooring finishes and are compatible with standard fasteners (screws, nails).
Care: To extend the life of your floorboards, take the following steps:
- Protection: Use protective coverings (e.g., plastic sheeting) during construction and renovation to avoid scratches or damage.
- Cleaning: Clean spills and messes immediately to prevent moisture damage.
- Maintenance: Regularly inspect for any signs of damage or wear and tear, and address any issues promptly. Consider applying a sealant or protective coating if the boards will be exposed to moisture or heavy use.