Setup, Compatibility & Care
Installation requires standard central heating plumbing connections. Before mounting, ensure your wall type (e.g., masonry or stud) can support the weight of a 3-column radiator, as these units are heavier than single-panel options.
- Use the provided brackets to mark drill holes accurately.
- Ensure the radiator is level to prevent air locks.
- Tighten the blanking plug and bleed valve before opening system valves.
- Bleed the radiator after initial filling to remove trapped air.
For care, wipe the black finish with a soft, dry cloth. Avoid abrasive cleaners or acidic chemicals, which can strip the protective finish. Check the bleed valve annually before the start of the heating season to ensure the system is free of air.