Setup, Compatibility & Care
For installation, ensure your wall can support the weight of the unit and that your current central heating system pipework matches the 450mm center requirements. The radiator projects 87–93mm from the wall, so account for this when placing furniture nearby. Care instructions involve dusting the surface with a soft, dry microfiber cloth. Avoid using abrasive sponges, harsh chemicals, or bleach-based cleaners, as these can strip the metallic gold finish or cause corrosion. Periodically check the bleed valve at the start of the heating season to ensure no trapped air is inhibiting performance.