Gledhill Indirect Envirofoam Lagged Steel Cylinder - SE36x18IND

Duplex stainless steel vented cylinder providing hot water. It is the perfect replacement for an e...

Best current price£298.80from City Plumbing GB

All Offers

2 offers from £298.80 - £334.00

View price history by clicking the chart icon.

City Plumbing GBGledhill Indirect Envirofoam Lagged Steel Cylinder 900 X 450Mm Se36x18ind
Free delivery in 1–3 days
£298.80
Visit shop
B&QB&Q - Envirofoam Stainless Steel 117L Indirect Vented Cylinder 900 X 450 Se36X18Ind
Free delivery in 1–3 days
£334.00
Visit shop

Product Information

Full details

This guide is for homeowners and installers seeking to understand and effectively utilize the Gledhill Indirect Envirofoam Lagged Steel Cylinder (SE36x18IND). This cylinder is designed to replace existing copper cylinders, offering a modern, efficient solution for hot water needs. Note that professional installation is recommended due to the complexity of plumbing systems.

All features

Model Part NumberSE36x18IND
BrandGledhill

Extended Product Information

FAQs

What is the lifespan of the cylinder?

The stainless steel construction ensures a long lifespan, typically exceeding that of traditional copper cylinders.

Can I install this myself?

While the installation is designed to be straightforward, professional installation is recommended to ensure correct operation and compliance with regulations.

What are the dimensions of the cylinder?

The dimensions are dependent on the specific model (SE36x18IND) and can be found in the product specifications.

Is the cylinder insulated?

Yes, it is equipped with Envirofoam insulation to minimize heat loss and maximize energy efficiency.

Does it come with a warranty?

Warranty details are usually provided with the product documentation; refer to the manufacturer's information.

What type of fittings are included?

The cylinder comes complete with compression fittings for ease of installation.

Can it be used with a power shower?

Yes, it is designed with a secondary return/power shower take off to support power shower systems.

Troubleshooting

Water not heating up.

Check the boiler, ensure the thermostat is set correctly, and inspect the connections to the cylinder.

Low water pressure.

Check for blockages in pipes or the cylinder itself. Ensure the mains water supply is adequate.

Leaks from fittings.

Tighten compression fittings. If leaks persist, replace the fittings.

Pros and Cons

Pros

  • Durable stainless steel construction for long life.
  • Designed for easy replacement of existing copper cylinders.
  • Efficient hot water delivery with a vented design.
  • Includes compression fittings, simplifying installation.
  • Supports power showers and secondary returns.

Cons

  • Requires professional installation for optimal performance.
  • May require modifications to existing plumbing.
  • The initial cost might be higher compared to some alternatives.

Setup, Compatibility & Care

Setup:

  1. Ensure the existing plumbing system is drained and the power supply is off.
  2. Carefully remove the old cylinder, disconnecting all pipes and fittings.
  3. Install the Gledhill cylinder, using the supplied compression fittings.
  4. Connect to the hot and cold water supply.
  5. Turn on the water supply and check for leaks.

Compatibility:

  • Designed to replace existing copper cylinders.
  • Compatible with standard UK plumbing systems.
  • Suitable for use with various boiler types.

Care:

  • Regularly inspect for leaks or corrosion.
  • Insulate pipes to conserve energy.
  • Flush the system periodically to remove sediment.

Similar items

Price History

DatePrice
Visit shop