Setup, Compatibility & Care
Installation involves assembling the ground mounting frame according to the provided instructions, attaching the panels, and connecting them to the 800W microinverter. Ensure all cable connections are firm and secure. The system requires an outdoor IP-rated socket for safety. For care, regularly clean the glass surfaces of the panels with soft water and a non-abrasive cloth to remove dust, pollen, or debris that might impede efficiency. During winter months or heavy storms, check the integrity of the frame mounting to ensure the system remains stable. Periodically check the app to ensure firmware for the microinverter is up to date and that the system is reporting data correctly.