Setup, Compatibility & Care
- Preparation: Dig the post hole to the appropriate depth.
- Post Placement: Insert the wooden post into the hole.
- Mixing: Mix the Pro-Set components thoroughly within the bag.
- Application: Pour the mixed foam into the hole around the post, ensuring it surrounds the base.
- Setting: Allow the foam to expand and harden (3-5 minutes).
- Curing: Full load strength is achieved in approximately 90 minutes. Avoid applying excessive force during this time.
Compatibility: Pro-Set is compatible with all types of wooden posts. Make sure the hole is wide enough to accommodate the expanding foam.
Care: Store Pro-Set in a dry place. Avoid contact with skin and eyes. If contact occurs, rinse immediately with water. Dispose of the packaging responsibly.