Setup, Compatibility & Care
Before adding the Sentinel X100, ensure your heating system is switched off and has cooled down to room temperature to prevent burns or pressure release.
- Drain/Isolate: If using a filling loop, ensure the system is properly pressurized and the point of entry is accessible.
- Dosing: Inject the fluid through a convenient radiator bleed point using an adapter or directly via the filling loop on a combi system.
- Circulation: Once added, switch the heating on for at least 30 minutes to allow the pump to distribute the inhibitor evenly throughout the entire circuit.
- Maintenance: Mark your calendar to test the system's inhibitor concentration levels every 12 months. This is typically done using an inhibitor test kit during your annual boiler service.