Setup, Compatibility & Care
Compatibility:
This fitting is designed exclusively for solvent weld waste pipes and is not compatible with push-fit or compression fittings.
**Installation Steps (Solvent Weld Joint):
**
- Clean Surfaces: Ensure the outer wall of the pipe and the inner wall of the fitting socket are clean, dry, and free from dirt, grease, or swarf.
- Apply Solvent Cement: Apply a uniform layer of appropriate solvent cement (e.g., FloPlast SC250) to both the pipe end and the inside of the fitting socket.
- Join and Twist: Immediately push the pipe fully into the fitting socket, giving it a quarter-turn twist to ensure even distribution of the solvent cement and full contact.
- Hold and Set: Hold the joint firmly for approximately 30 seconds to prevent any movement while the initial bond sets.
- Clean Excess: Wipe away any excess solvent cement with a clean, damp cloth.
- Curing Time: Allow the joint to set for at least 5 minutes before moving. The installed system should be left undisturbed for a minimum of 12 hours before testing with water.
Important Safety Note: Always work in a well-ventilated area when using solvent cement. Keep the cement away from heat sources and naked flames. Avoid skin contact; if it occurs, wash immediately with soap and water.
Care:
This fitting requires no specific ongoing maintenance beyond ensuring the connected waste system is clear of blockages. The ABS material is inherently resistant to corrosion and most household chemicals.