Setup, Compatibility & Care
Setup
- Preparation: Ensure the cavity wall dimensions are within the 90–105mm range. Measure the required lintel length based on the opening width, adding the necessary end bearing length.
- Positioning: Place the lintel into position, ensuring it is level and properly supported.
- End Bearings: Install with a nominal 150mm end bearing on each side for optimal load distribution and stability.
- Leaf Alignment: Ensure both inner and outer leaves are properly aligned for accurate support.
- Fixing: Secure the lintel according to the manufacturer's instructions, ensuring adequate support.
- Blockwork: Before installing flooring or roof elements, lay one course of blockwork for enhanced structural performance.
Compatibility
The Catnic CG90/100 is compatible with cavity wall constructions using standard building materials. Ensure that the materials used, like brick or block, align with the lintel's load-bearing capacity and the building's structural requirements.
Care
- Protect the lintel from damage during handling and installation.
- Regularly inspect the lintel for any signs of corrosion or damage, especially in harsh weather conditions. The galvanised steel is corrosion resistant, but inspection is still recommended.
- Ensure proper drainage to prevent water accumulation that could affect the structural integrity.