Setup, Compatibility & Care
Setup: The tape should be laid directly above the sewer pumping main at a specified depth, typically 150-300mm below the final surface level, depending on local regulations and excavation depths anticipated. Ensure the tape is laid flat and is not kinked.
Compatibility: This tape is designed for use with standard metal detection equipment capable of sensing stainless steel wires. It is specifically intended for marking sewer pumping mains and is not intended for general-purpose underground marking.
Care: The tape requires no special care once installed. Its durable construction is designed to withstand underground conditions. Avoid unnecessary handling or exposure to extreme conditions before installation. Clean any dirt or debris from the tape before laying it to ensure a clear surface for future detection.