Setup, Compatibility & Care
To ensure a successful installation, follow these steps:
- Preparation: Cut the 22mm copper pipe squarely and remove all burrs from the cut edge.
- Cleaning: Use a wire brush or abrasive cloth to clean the exterior of the pipe end and the interior of the fitting socket until bright metal is visible.
- Fluxing: Apply a thin, even layer of plumbing flux to both the pipe end and the fitting socket. Do not over-apply flux, as excess can enter the pipe system.
- Heating: Insert the pipe fully into the fitting and apply heat evenly around the joint using a blowtorch. Test the heat by touching the solder to the joint; when it melts on contact, the temperature is correct.
- Finishing: Allow the joint to cool naturally without agitation. Once cool, wipe away any flux residue, as acidic flux can cause corrosion over time if left on the copper surface.
These fittings are strictly designed for 22mm copper pipe and should not be forced onto pipes of different materials or diameters.