Setup, Compatibility & Care
- Assembly: Follow the provided instructions. Assembly is required and may take some time.
- Placement: Choose a location that receives ample sunlight. Ensure the ground is level.
- Soil: Prepare the soil inside the cold frame with appropriate nutrients and drainage.
- Ventilation: Use the doors and top roof opening to control temperature and humidity.
- Watering: Water plants as needed, monitoring soil moisture regularly.
- Cleaning: Clean the polycarbonate panels with mild soap and water. Avoid abrasive cleaners.
- Maintenance: Inspect the frame and panels regularly for damage. Tighten screws as needed.
