Setup, Compatibility & Care
Setup
- Surface Preparation: Ensure the surface is clean, dry, and free from loose debris, oil, grease, and existing coatings. Use a suitable cleaner to remove any contaminants. Allow the surface to dry completely before application.
- Application: Apply Everbuild Block Guard using a brush, roller, or sprayer. Apply evenly, avoiding puddling.
- Coats: Apply a second coat after the first has dried, typically within a few hours. The number of coats needed may vary based on the surface porosity.
- Drying: Allow the treated surface to dry completely before use, usually 24-48 hours, depending on weather conditions.
Compatibility
Everbuild Block Guard is compatible with:
- Block paving
- Natural stone
- Cement-based flagstones
Check for compatibility on a small, inconspicuous area before applying to the entire surface.
Care
- Cleaning: Regularly sweep the surface to remove loose debris. Clean with mild soap and water as needed.
- Maintenance: Reapply Everbuild Block Guard every few years, or as needed, to maintain protection.