Setup, Compatibility & Care
Setup:
- Identify a suitable location for the ground anchor bolts, ensuring the ground is firm and stable.
- Screw the four 10MM x 70MM ground anchor bolts into the ground until they are securely embedded.
- Attach one end of each 1M PVC-coated tethering cable to the ground anchor bolts using the 8MM galvanized dee shackles.
- Connect the other end of each tethering cable to the caravan's designated anchor points using the remaining 8MM dee shackles.
- Utilize the M10 hook and hook straining screws to connect the cables to the caravan's anchor points or to the shackles, adjusting the tension as needed. The straining screws can extend from a minimum of 218MM to a maximum of 310MM.
Compatibility:
This kit is designed for static caravans. Ensure your caravan has suitable, reinforced anchor points to attach the dee shackles and straining screws. The ground anchor bolts are best suited for firm soil or grass.
Care:
Regularly inspect all components for signs of wear, corrosion, or damage. Clean the cables and metal parts with a damp cloth to remove dirt and debris. Ensure straining screws remain free of excessive rust and are lubricated if necessary for smooth operation. Check tension periodically, especially after periods of severe weather.