Setup, Compatibility & Care
Before installation, ensure your gate and post are level to prevent binding.
- Align the 100mm fixing plate against the gate surface.
- Mark the 6mm hole positions accurately.
- Use a pilot drill bit before driving the provided stainless steel screws to prevent timber splitting.
For ongoing maintenance, wipe the hinges down with a soft, damp cloth and a mild detergent to keep the mirror finish clear of debris. Avoid using abrasive chemicals or steel wool, as these can scratch the surface finish and compromise the protective oxide layer of the stainless steel.