Setup, Compatibility & Care
For optimal performance, the mesh should be laid directly above the electrical conduit or cable run at a depth specified by local utility regulations—usually several inches above the actual asset. Ensure the mesh is laid flat, preventing it from bunching up, as this can affect both the visual warning and the ease of future detection. The mesh does not require specialized maintenance, but site managers should document the exact depth and route of the mesh in the site's digital as-built records. If the mesh is disturbed during minor work, it should be repaired or replaced with a section of the same specification to maintain continuity of the detectable wire.