Setup, Compatibility & Care
To install, ensure your surface is clean and level before marking the four holes for the 13 mm anchor points. The base plate features hole spacing at 50 mm and 130 mm.
Installation Steps:
- Position the base plate and mark the anchor locations.
- Drill appropriate holes into your concrete or wooden substrate.
- Secure the base using heavy-duty masonry or coach bolts.
- Attach your 80x80 mm timber post to the top support plate.
- Adjust the height by turning the central nut using an SW 36 tool.
- Check for levelness using a spirit level, then lock the nut.
Care: Regularly inspect the galvanized coating for scratches or chips. If the metal is exposed, apply a cold-galvanizing spray or touch-up paint to prevent oxidation.