Setup, Compatibility & Care
Assembly is required upon delivery; ensure all parts are laid out on a flat surface before starting. Use the provided hardware to connect the steel frame segments before attaching the PE rattan weave. Regarding care, the unit is low-maintenance due to its material properties; simply spray it down with a garden hose to remove salt or chlorine buildup and wipe with a soft cloth. During extreme winter weather or heavy storms, it is recommended to store the unit under a cover or in an indoor space to maximize the lifespan of the steel frame.