Setup, Compatibility & Care
To ensure a successful application, follow these steps:
- Acclimatization: Open the packaging and let the tiles sit in the room where they will be installed for 48 hours to allow them to adjust to the ambient temperature and humidity.
- Surface Preparation: The wall must be clean, dry, and completely smooth. Remove all dust, grease, and debris. If applying to a painted wall, ensure the paint is fully cured and not peeling.
- Application: Peel the backing paper away and press the tile firmly onto the surface, starting from the center and smoothing outwards to remove air bubbles.
- Maintenance: Clean the tiles using a soft cloth with mild, soapy water. Avoid abrasive sponges, scourers, or harsh chemical cleaners, as these can scratch or degrade the decorative surface.