Setup, Compatibility & Care
Setup
Proper installation is key to the longevity and stability of your Bradstone Peak Paving Slabs. Here's a general overview:
- Prepare the Area: Excavate the area to the required depth, accounting for the slab thickness, bedding layer, and sub-base.
- Lay the Sub-Base: Install a minimum 100mm (4 inches) layer of well-compacted sub-base material (e.g., MOT Type 1). Ensure it's level and stable.
- Create a Bedding Layer: Apply a 30-50mm (1.2-2 inches) layer of sharp sand or a sand/cement mix (typically 6:1 or 8:1 ratio). Level this precisely.
- Lay the Slabs: Carefully place each slab onto the bedding layer, using a rubber mallet to gently tap it down and ensure it's level with adjacent slabs and has a slight fall for drainage. Maintain consistent joint widths.
- Jointing: Once all slabs are laid and stable, fill the gaps between them with a suitable jointing compound or dry sand/cement mix.
Compatibility
These paving slabs are compatible with all standard outdoor ground-level applications where pedestrian traffic is expected. They integrate well with various garden designs, from traditional to contemporary, thanks to their natural aesthetic. They are not recommended for areas subject to vehicular traffic.
Care
- Regular Cleaning: Sweep the slabs regularly to remove loose dirt, leaves, and debris.
- Stain Removal: For more stubborn dirt or algae, use warm water and a stiff brush. Pressure washers can be used but with caution, as high pressure can damage jointing or etch the surface if used too close.
- Moss & Algae Control: Apply proprietary patio cleaner solutions if moss or algae become an issue, following the product's instructions.
- Efflorescence: White deposits (efflorescence) may appear shortly after installation. This is a natural phenomenon for concrete products and typically weathers away over time. Specialist cleaners are available if faster removal is desired.