DJI Matrice 400 Dual Gimbal Connector - CP.EN.00000671.01

Best current price£210.00from DJI UK
Best offers
Shopping.co.uk recommended and popular offers
Dji Matrice 400 Dual Gimbal Connector
Visit shop
Best current price£210.00from DJI UK
Shopping.co.uk recommended and popular offers
Dji Matrice 400 Dual Gimbal Connector
Visit shop1 offer from £210.00
View price history by clicking the chart icon.
The DJI Matrice 400 Dual Gimbal Connector (CP.EN.00000671.01) is designed for professional industrial drone operators who require simultaneous multi-sensor data collection during a single flight. Its primary benefit is the ability to mount dual payloads securely beneath the nose of the aircraft, significantly increasing operational efficiency for mapping, surveillance, and inspection missions. Note that this accessory requires specific configuration via the E-Port V2 interface and may impact overall flight time due to increased payload weight.
| Model Part Number | CP.EN.00000671.01 |
|---|---|
| Brand | DJI |
No, this specific connector is engineered exclusively for the DJI Matrice 400 airframe.
Yes, the increased power consumption and total weight will generally lead to a decrease in maximum flight time compared to a single payload setup.
The E-Port V2 provides the necessary data and power communication channels for the dual gimbals to function with the aircraft's internal systems.
You must ensure that the chosen payloads are supported by the Matrice 400 platform and that their combined weight is within the manufacturer's specified payload limits.
Keep the ports free of dust and debris by using a soft brush or low-pressure compressed air; avoid using liquids or abrasive materials.
Power down the aircraft, check the connection at the E1 and E2 ports, and ensure all pins are clean and fully seated.
Verify that the combined payload weight is within the aircraft's limits and re-calibrate the IMU and compass if necessary.
Check the communication cables for physical damage or sharp bends that may interrupt signal transmission.
To install, ensure the aircraft is powered off, then align the connector with the nose mounting point and secure it according to the official hardware specs. Connect your payloads to the E1 and E2 ports provided on the E-Port V2. Always verify that the locking mechanism is fully engaged before takeoff. For maintenance, keep the E-Port pins clean and free of debris using compressed air. Avoid exposure to extreme moisture or corrosive environments to prevent terminal oxidation. Regularly check the mounting screws for signs of vibration-induced loosening.