Extra Long Lead Rope - Black


Best current price£6.74from VioVet
Best offers
Shopping.co.uk recommended and popular offers
VioVet£6.74Visit shop Shires Extra Long Lead Rope - Metres Black Size 3
Visit shop

Best current price£6.74from VioVet
Shopping.co.uk recommended and popular offers
VioVet£6.74Visit shop Shires Extra Long Lead Rope - Metres Black Size 3
Visit shop2 offers from £6.74 - £7.19
View price history by clicking the chart icon.
This guide is for horse owners seeking a reliable and versatile lead rope. The Shires Extra Long Lead Rope in Black provides extended reach and control, making it ideal for various equestrian activities. Note that the 3-meter length may be more than needed for some users.
| Colour | Black |
|---|---|
| Model Part Number | 036/440BLK |
| Brand | Shires |
The lead rope is 3 meters (118") long.
The rope is made from soft-feel braided material.
It uses a brass swivel trigger clip.
This model is available in Black.
Clean the rope with mild soap and water and allow it to air dry.
Ensure the clip is free of debris and lubricate if necessary.
Replace the lead rope immediately to prevent breakage.