Setup, Compatibility & Care
To install, clear the area of sharp objects that could puncture the fabric. Lay the sheets out across the excavated area, ensuring that adjacent sections overlap by at least 300-500mm to maintain the barrier. Secure the edges with fixing pins or heavy aggregate to prevent movement during the construction phase. The fabric is compatible with all standard sub-base materials, including MOT Type 1 and Type 3 hardcore. Once installed, avoid driving heavy tracked machinery directly over the fabric before the protective layer of aggregate has been laid to prevent potential tears.