Setup, Compatibility & Care
Installation Steps
- Ensure all vertical or horizontal support battens are level and securely fixed to the wall.
- Position the starter trim at the desired start point of your cladding run.
- Secure the trim to the battens using appropriate corrosion-resistant fixings, checking for levelness along the entire 5-meter length.
- Slide the first cladding board into the channel until fully seated.
Compatibility
This trim is compatible with standard PVC Shiplap and V-Joint cladding boards. It is not intended for use with flat-panel or square-edge cladding systems.
Care and Maintenance
- Cleaning: Wipe down with a mild soap solution and a soft cloth to remove dust or debris.
- Inspection: Periodically check that the drainage gap remains clear of debris to ensure continued airflow.
- Avoid: Do not use abrasive scouring pads or solvent-based cleaners, as these may damage the woodgrain finish.