Pegdev Detectable Gas Pipe Mesh - 200mm x 8m

Best current price£11.47from B&Q
Best offers
Shopping.co.uk recommended and popular offers
B&Q£11.47Visit shop B&Q - Detectable Mesh (Gas Pipe) Durable Underground Service Marker 200mm X 8M
Visit shop
Best current price£11.47from B&Q
Shopping.co.uk recommended and popular offers
B&Q£11.47Visit shop B&Q - Detectable Mesh (Gas Pipe) Durable Underground Service Marker 200mm X 8M
Visit shop2 offers from £11.47
View price history by clicking the chart icon.
The Pegdev Detectable Gas Pipe Mesh is an essential safety solution for utility contractors, groundworkers, and civil engineers looking to prevent accidental utility strikes during excavation. By integrating a high-visibility yellow mesh with a detectable wire, it provides both visual and electronic warning signals for buried gas infrastructure; however, users must ensure the wire is properly grounded or connected to a tracer signal to enable effective underground detection.
| Brand | Pegdev |
|---|
Yes, this product is manufactured in accordance with BS12613:2023 standards.
This specific product is printed with 'CAUTION - BURIED GAS PIPE' and is intended for gas infrastructure. Do not use for water pipes to avoid confusion.
Standard industry practice is to place the mesh approximately 300mm above the buried asset.
The mesh is designed for underground use and is constructed to be resistant to moisture and common soil chemicals.
The mesh can be cut to length with standard utility knives or heavy-duty scissors during the backfill process.
No, this is a safety device intended to be buried as a permanent warning indicator.
Ensure the signal generator is properly grounded and that there is a continuous connection to the metal wire within the mesh.
Ensure the mesh is installed at the correct depth (typically 300mm above the pipe) to provide sufficient warning before the excavator reaches the hazard.
Installation should be conducted by trained groundworkers. The mesh should be laid flat directly above the pipe run, ensuring the printed text faces upward for maximum readability. To maintain detection capabilities, ensure that the metal wire is not severed during the backfilling process; use appropriate splicing connectors if the roll needs to be joined. Regarding care, the mesh is a single-use safety item and should not be reused if removed from a trench, as structural integrity may be compromised by the initial excavation. Always ensure the mesh is installed in accordance with local utility regulations and the BS12613:2023 guidelines.