Setup, Compatibility & Care
Setup
- Preparation: Ensure the cavity wall is built to the correct dimensions (90–105mm cavity width). Verify the opening size for windows or doors.
- Bearing: Place the lintel with a minimum of 150mm end bearing on both sides of the opening. Use appropriate shims to level the lintel.
- Leaf Alignment: Ensure both inner and outer leaves are properly aligned before setting the lintel.
- Fixing: The lintel does not require separate fixing as it is built into the wall. Ensure the lintel is fully supported by the blockwork.
- Blockwork: Lay at least one course of blockwork before installing flooring or roof elements.
Compatibility
The Catnic CG90/100 is compatible with:
- Cavity walls with widths between 90mm and 105mm.
- Inner leaves of 100–115mm.
- Outer leaves of 100–102mm.
- Standard duty applications in domestic and light commercial buildings.
Care
- Handle the lintel with care to avoid damaging the galvanised coating.
- Store the lintel in a dry place before installation.
- Inspect the lintel for any damage before installation.
- If the coating is damaged, use appropriate touch-up paint to prevent corrosion.