Setup, Compatibility & Care
- Preparation: Ensure the cavity wall width is between 90mm and 105mm. Check that the inner leaf is between 100–115mm and outer leaf is 100–102mm.
- Placement: Position the lintel in the opening, ensuring a minimum 150mm end bearing on both sides for load distribution.
- Support: Use appropriate support during installation.
- Installation: The inner and outer leaves can be raised together. Ensure the lintel is level and securely bedded in mortar.
- Finishing: Complete the wall construction, ensuring that the lintel is fully integrated.
Care:
No specific care is required. However, it's good practice to protect the lintel from excessive exposure to the elements during installation. Regular inspection is recommended as part of routine building maintenance.