Setup, Compatibility & Care
- Preparation: Clear the area of any existing vegetation, debris, and ensure the ground is level.
- Laying: Spread the chippings evenly to your desired depth (typically 3-5cm).
- Compaction: Lightly compact the chippings to settle them in place. This is not always necessary, but it can help.
- Compatibility: Suitable for use with weed membrane to further suppress weed growth. Ensure the membrane is properly installed before laying the stone.
- Care: Minimal maintenance is required. Periodically remove any larger debris or leaves. As this is a natural material, rainfall will naturally wash away any sediment that may be present.
Important: Ensure you have the necessary equipment to handle and move the bulk bag safely. Always wear appropriate personal protective equipment (PPE) during installation.