Shires Extra Long Lead Rope - Green

A useful extra long lead rope with a brass swivel trigger clip. Length: 3m (118"). The Shires Extr...

Best current price£6.74from VioVet

All Offers

2 offers from £6.74 - £7.19

View price history by clicking the chart icon.

VioVetShires Extra Long Lead Rope - 3Metres Green
£3.49 delivery
£6.74
Visit shop
GS EquestrianShires Green Extra Long Lead Rope - / One Size
Free delivery in 1–3 days
£7.19
Visit shop

Product Information

Full details

A useful extra long lead rope with a brass swivel trigger clip. Length: 3m (118"). The Shires Extra Long Lead Rope provides additional length for greater flexibility when leading, tying up, or carrying out groundwork. Measuring 3 metres, it is ideal for horses that require that extra space. Made from durable, soft-feel braided rope for comfortable handling. Finished with a strong trigger clip for secure and reliable attachment to a headcollar. 3m length for added reach and control, soft-feel braided rope for comfort, hardwearing and durable design, secure trigger clip fastening, available in a range of colours. A practical and versatile lead rope, suitable for everyday use.

All features

ColourGreen
BrandShires

Price History

DatePrice
Visit shop