Setup, Compatibility & Care
To ensure a successful installation, follow these steps:
- Preparation: Use a fine-tooth saw to cut the pipe square and remove all burrs with a file to ensure a smooth surface.
- Cleaning: Thoroughly clean both the pipe end and the interior of the bend socket with a dry cloth; remove any dust or grease.
- Application: Apply solvent weld cement evenly to both surfaces.
- Joining: Push the pipe into the fitting with a slight twisting motion to distribute the cement evenly. Ensure it is fully seated to the depth of the long tail.
- Setting: Allow the joint to remain undisturbed for at least 5 minutes before applying any load, and wait 12 hours before turning on the water supply or testing the system for leaks.
Care: Avoid contact with harsh chemicals or abrasive cleaners that could degrade the plastic structure over time. Periodically inspect joints for signs of damage or shifting.