Setup, Compatibility & Care
Successful installation requires digging a circular hole slightly wider than the 10ft frame and deep enough to allow for proper air displacement during jumping. Ensure the drainage at the bottom of the pit is sufficient to prevent water buildup.
- Excavation: Dig the pit to the required depth using the provided manual measurements.
- Retaining Wall: Secure the wall panels to prevent soil erosion into the pit.
- Assembly: Construct the galvanized frame and attach the jumping mat.
- Maintenance: Regularly check the safety pad for wear and ensure the enclosure net clips are secure. Rinse the jumping mat with water to remove dirt, and utilize the included cover during extended periods of inactivity to protect the frame and springs from environmental wear.