Setup, Compatibility & Care
Before application, ensure the concrete floor is free of loose debris, oil, and grease. If the floor is painted, ensure the old coating is well-bonded; loose paint must be removed and the surface sanded to create a profile for the new coat.
- Mix the two-part formula thoroughly according to the provided ratio.
- Apply using a medium-nap roller for an even finish.
- Allow the coating to cure for at least 24 hours at 15 degrees Celsius before allowing light foot traffic.
- Avoid driving vehicles on the surface until it is fully cured (consult technical specifications for full heavy-load cure time).
- Clean finished floors with mild non-abrasive detergents to maintain the gloss and integrity of the finish.