Setup, Compatibility & Care
To ensure a lifetime seal, follow these installation steps:
- Pipe Preparation: Ensure the 22mm copper pipe is cut square, deburred, and free of any scratches, dirt, or grease in the area where the O-ring will seat.
- Marking: Measure and mark the insertion depth on the pipe to confirm the fitting is fully seated during pressing.
- Pressing: Slide the pipe into the PrimaPress fitting until it hits the stop. Align the jaws of your M-profile press tool directly over the fitting bead.
- Completion: Activate the press tool until the cycle is complete.
Maintain system integrity by keeping the press tools calibrated per manufacturer specifications and storing fittings in a clean, dry environment to prevent O-ring contamination.