Setup, Compatibility & Care
To ensure a lifetime of service, follow these installation guidelines:
- Preparation: Ensure the pipe end is free of burrs and sharp edges that could damage the internal O-ring seal.
- Marking: Insert the pipe fully into the fitting and mark the insertion depth to verify that the pipe does not shift during the pressing process.
- Tooling: Use only M-profile pressing jaws matching the fitting size (15mm to 54mm). Do not use V-profile or other jaw types, as they may compromise the integrity of the connection.
- Inspection: Perform a low-pressure air or water test to trigger the leak detection system before finalizing the installation.
- Maintenance: While the fittings are maintenance-free once installed, ensure that the system pressure does not exceed the PN16 rating and temperatures remain within the -10 to 110-degree range.