Setup, Compatibility & Care
To ensure a professional installation, use 2 x 50mm Polytop nails at every support point. The spacing between these fixing points must not exceed 400mm; a standard 5m length will require approximately 26 nails.
Installation Tips:
- Measure the existing fascia to ensure the 30mm internal depth provides enough clearance.
- In new build scenarios, verify that your 25mm timber backing board is level and secured properly before mounting the UPVC capping.
- Always allow for small thermal expansion gaps at joints if installing in extreme temperature fluctuations.
Care Instructions:
- Clean periodically with mild soapy water and a soft cloth to remove dust and environmental grime.
- Avoid abrasive cleaners or scouring pads, as these can permanently damage the woodgrain texture.