Setup, Compatibility & Care
- Preparation: Ensure joints are cleaned out to a depth of 25mm with a minimum width of 3mm. Make sure the paving is firmly bedded and stable.
- Application: Apply when the surface temperature is above 0°C. Soak the paving liberally first.
- Mixing: Empty the mix evenly onto the surface and work quickly into the joints.
- Tools: Use a brush or squeegee to work the compound into the joints.
- Curing: Allow to set according to the weather conditions. Foot traffic can be applied after 12 hours in ideal conditions.
*Compatibility*: Suitable for use with natural stone and concrete paving. Available in a range of colours to match your paving, including Mid-grey, basalt and black.
*Care*: No specific maintenance is required after application. However, avoid using high-pressure washers directly on the joints.