Setup, Compatibility & Care
To set up the castle, clear the ground of any sharp objects, stones, or branches that could puncture the material. Once the unit is spread out, connect the air tube to the blower and secure the base using the provided ground stakes. Always keep the blower running during the entire duration of use.
For care and maintenance, it is normal to see air bubbles at the seams, as these are necessary for pressure management. After play, drain the water completely and ensure the structure is fully dry before folding. Always store the folded unit in the provided carrying bag within a shaded, ventilated area to preserve the material integrity.