Setup, Compatibility & Care
Installation should be performed by a qualified electrician to ensure safety and compliance with local electrical codes. 1. Mount the steel enclosure to a flat wall surface using the mounting holes. 2. Connect the ATS input to your generator using the provided 8-pin control cable. 3. Wire the mains input and generator load output to the respective terminals inside the unit. 4. Verify connections and toggle the switch to 'Auto'. To maintain the unit, keep the surrounding area free of dust and moisture, as the system is rated for 0-60% relative humidity. Regularly inspect the 8-pin cable for signs of wear and ensure the emergency stop button remains unobstructed.