Setup, Compatibility & Care
To install, ensure the copper pipe ends are cut square, deburred, and free from dirt or paint. Slide the nut and the olive onto the pipe, insert the pipe fully into the fitting body, and tighten the nut by hand before finishing with a spanner. For gas applications, always check with an industry-certified professional to ensure compliance with local safety regulations. While the fitting is maintenance-free once correctly installed, it is recommended to periodically inspect joints for any signs of surface oxidation or weeping. Avoid using chemical pipe dopes or excessive thread sealant as they are generally unnecessary with properly seated compression olives.