Pegdev Detectable Gas Pipe Mesh - 200mm x 2m

Best current price£8.38from B&Q
Best offers
Shopping.co.uk recommended and popular offers
B&Q£8.38Visit shop B&Q - Detectable Mesh (Gas Pipe) Durable Underground Service Marker 200mm X 2M
Visit shop
Best current price£8.38from B&Q
Shopping.co.uk recommended and popular offers
B&Q£8.38Visit shop B&Q - Detectable Mesh (Gas Pipe) Durable Underground Service Marker 200mm X 2M
Visit shop2 offers from £8.38
View price history by clicking the chart icon.
The Pegdev Detectable Gas Pipe Mesh is an essential safety solution for utility contractors, landscapers, and civil engineers tasked with marking underground infrastructure. It provides a highly visible, early-warning system for buried gas lines, effectively preventing accidental strikes during excavation. While it is highly durable and compliant with industry standards, users should ensure the mesh is installed at the correct depth to guarantee the detectable wire remains effective for utility locators.
| Model Part Number | 0687589695195 |
|---|---|
| Brand | Pegdev |
The product conforms to the BS12613:2023 standard for detectable warning devices.
While this specific product is printed for gas pipes, the mesh structure is similar, but we recommend using products specifically marked for the utility type to comply with safety labeling regulations.
No, the wire acts as a conductor for an external signal transmitter used by utility surveyors.
No, it is designed to be rot-resistant to ensure it remains in the ground for the lifespan of the utility pipe.
The dimensions are 200mm in width and 2 meters in length.
Yes, but ensure a layer of soft sand or soil is placed around the pipe and mesh to protect the material from abrasion.
Ensure the detectable wire is continuous and not broken during backfilling; verify the connection point is properly grounded or connected to the signal transmitter.
Use finer backfill material immediately around the pipe and mesh to prevent sharp rocks from puncturing the material.
To ensure optimal performance, the mesh should be laid flat directly over the backfill material above the pipe, typically at a specified depth depending on local utility regulations. When joining sections of the mesh, ensure the detectable wires are overlapping or connected to maintain electrical continuity across the entire run.
Regarding care, because the material is rot-resistant, it does not require maintenance once installed. However, if the ground is opened for repairs, verify that the mesh is replaced and not buried under excessive debris that might obscure its visibility. Always store unused rolls in a cool, dry area away from direct sunlight to prevent premature UV degradation of the plastic before it is installed underground.