Setup, Compatibility & Care
Installation must be performed by qualified professionals, as it requires specific excavation depths to accommodate the 250mm riser. The unit should be positioned in a location that allows for gravity-fed drainage while remaining accessible for periodic tanker emptying. Maintenance should include an annual inspection of the compressor and the air filter to prevent system blockages. Ensure the area above the installation is clear of heavy traffic or structures not rated for the weight capacity of the tank lid. Always verify with local building control that the installation meets site-specific requirements before commencing groundworks.