Setup, Compatibility & Care Instructions
Setup:
- Site Selection: Choose a level, well-drained area that receives adequate sunlight.
- Frame Assembly: Assemble the galvanized steel frame according to the provided instructions. Ensure all connections are secure.
- Cover Installation: Drape the PE cover over the assembled frame, ensuring it is aligned correctly.
- Securing the Cover: Use the overlong edges to bury into the soil around the base for maximum stability. Attach any included ties or clips.
- Anchoring: Utilize the included ground stakes and guy ropes, securing them firmly to the ground at appropriate angles.
- Door and Windows: Ensure the hinged door is correctly installed and latched, and that all roll-up windows function properly.
*Assembly is recommended for two-to-three people due to the size of the structure.*
Compatibility:
This polytunnel is designed for direct ground placement and can be used on soil, gravel, or even over raised beds. It is compatible with most common gardening tools and watering systems used within its footprint.
Care:
- Cleaning the Cover: Use a soft cloth or sponge with mild soap and water to clean the PE cover. Rinse thoroughly and allow to air dry. Avoid abrasive cleaners or brushes that could damage the material.
- Frame Maintenance: Periodically check the steel frame for any signs of wear or damage. Wipe down with a damp cloth to remove dirt.
- Seasonal Storage (Optional): If extreme weather is expected (heavy snow, high winds), it may be advisable to temporarily remove the PE cover to prevent damage. Store it clean and dry in a protected area.
- Anchoring Checks: Regularly inspect the ground stakes and guy ropes to ensure they remain secure, especially after strong winds or heavy rain.