Setup, Compatibility & Care
To install, fasten the trim securely to the building substrate using appropriate corrosion-resistant fasteners. A critical installation step is maintaining a minimum 5mm clearance between the edge of the fibre cement plank and the base of the trim channel. This space allows for thermal expansion and movement of the panels. Once the panels are positioned, an optional bead of high-quality exterior-grade caulking can be applied along the joint to improve weather integrity and visual aesthetics. For cleaning, periodically rinse the trim with water and a soft brush to remove dust or debris buildup that could hinder water drainage.