Setup, Compatibility & Care Instructions
Setup: Ensure the system is drained and isolated before installation. The thermostatic head should be positioned on the flow side, and the lockshield valve on the return side. Incorrect orientation will affect performance. Connect the 15mm compression inlets to your pipework and the 1/2 BSPT coupler to the radiator.
Compatibility: These valves are designed for traditional heating setups and radiators, including heated towel rails and cast iron style radiators. They are compatible with standard 15mm pipework and 1/2 BSPT radiator threads. They are *not* suitable for modern, non-traditional systems requiring automatic thermostatic control or bi-directional flow.
Care: Clean the matte black finish and wood handle with a soft, damp cloth. Avoid abrasive cleaners, which can damage the finish. Periodically check for leaks and ensure the valve operates smoothly. For instructions on fully shutting off the valve, consult the online user manual.