Setup, Compatibility & Care
To ensure a long-lasting, leak-free installation, always follow these best practices:
- Preparation: Ensure the 110mm drainage pipe is cut square and the end is chamfered to allow for a smooth entry into the socket.
- Lubrication: Generously apply a high-quality silicone lubricant to the pipe end and the rubber seal inside the socket. This reduces friction and prevents the seal from "rolling" during insertion.
- Insertion: Push the pipe firmly into the socket until it is fully seated. Do not use excessive force if you feel resistance; re-check the lubrication.
- Care: Avoid exposing the fittings to heavy machinery or extreme point loads before the trench is properly backfilled and compacted according to local building regulations.