Setup, Compatibility & Care
For a secure and lasting installation, ensure the rafters are aligned and clean before application. Position the board so the rear rebate aligns perfectly with your soffit board path.
Installation Requirements
- Fixing Method: Use 2 x 65mm polytop nails per rafter point.
- Spacing: Maintain a maximum distance of 600mm between fixings to prevent bowing or wind load failure.
- Compatibility: Designed for standard rafter-end roofline construction.
Care
Clean periodically with a mild detergent and water to remove grime. Inspect the fixings annually to ensure the polytop nails remain flush and have not been backed out by thermal expansion.