Setup, Compatibility & Care
For proper installation, trenches must be prepared with a suitable granular bedding material to ensure even weight distribution around the pipe circumference. When connecting lengths, ensure the integral coupler is seated correctly to prevent ingress of silt or groundwater. Always follow local utility regulations regarding depth and warning tape placement. While the material is highly resistant to ground conditions, avoid exposing the duct to prolonged direct sunlight or extreme temperature fluctuations before installation to maintain optimal material performance.