Setup, Compatibility & Care
To install, first locate the roof rafters through the slate tiles and carefully remove or shift tiles to expose the mounting surface. Fix the base plate of the hook directly into the rafter, ensuring that any penetration through the sarking is sealed with appropriate waterproof flashing material. Once the hook is secured, replace the slate tiles around the hook shank. The rail is then attached to the hook using the provided cross-connection components. Compatibility is limited to the Clenergy PV-ezRack rail series. Maintenance should include an annual inspection to ensure that all bolts remain tight and that there is no movement in the slate tiles surrounding the hook entry point.